Bâtiment B

Bâtiment B was planned, built, and operated using the BIM (Building Information Modelling) method. The digital 3D model streamlined and industrialised construction processes, contributing to a reduced carbon footprint.

To optimise the building’s operation, all elements and equipment were detailed in the model to give information about composition, the type of maintenance required, maintenance deadlines, and the recyclability of materials used.

Start of work November 2021
Commissioning 2023
SIA volume 34,562m³
Floor surface 8,428m²
Type of construction Local wood
Cost 25 million
Project owner BFF SA
Architects Ferrari Architectes
Main contractor JPF Entreprise Générale SA
Subcontractors 47 companies (38 from the Canton of Fribourg)
Attribution

Offices Laboratories Prototyping rooms Conference rooms Restaurant

Specifics 

Ventilated façade with burnt wood cladding ⋅ Bioclimatic concept ⋅ Planted atrium

Electricity Potential of 1,047m² of photovoltaic panels
Labels Minergie-P ⋅ Minergie-Eco ⋅ Minergie-A

Copyright ©Bluefactory. All rights reserved. – Fait avec le :cœur_bleu: par Up to you